SWAED technician working on a flowline inside an excavation

Project · GPOC

Flowline & Trunkline Normal Repair

EPC provision of flowline and trunkline normal repair work across the Unity oil field, keeping gathering lines in service.

Scope of Works

What SWAED delivered

  1. 1Engineering for each repair
  2. 2Procurement of sleeves, composite repair material and Stopaq coating
  3. 3Excavation of underground flowlines and trunklines of different sizes
  4. 4Coating removal and NDT to determine the repair method

Photo Gallery

5 photos from site

Have a project in mind?

Talk to our engineering team.

Contact Us