SWAED crew on scaffolding performing a tie-in at a well site

Project · DPOC

Water Disposal Tie-In — Wengi-3 & Wengi-9, Paloch FSF

Melut Basin Oil Development Project: maintenance and construction services for upstream production facilities — a new water disposal line tied in to Wengi-3 and Wengi-9.

Scope of Works

What SWAED delivered

  1. 1Manpower, equipment, tools and machinery for fabrication, dismantling, cut and tie-in
  2. 2Work execution plan, field re-verification and route survey
  3. 3Pipeline laydown, installation and hydrotest at the Wengi-3 & Wengi-9 well sites
  4. 4Re-painting of affected and welded areas on the new water disposal line
  5. 5Pipe supports for the aboveground line at suitable elevations
  6. 6Transportation and lifting of free-issue material

Photo Gallery

3 photos from site

Have a project in mind?

Talk to our engineering team.

Contact Us