Live Export Crude Pipeline Repair
EPC provision of pipeline repair & maintenance for the DPOC export pipeline and interfield pipeline — live repair of 210 km of 32-inch, 3LPP-coated crude line.
Scope of Works
What SWAED delivered
- 1Engineering for each repair point
- 2Procurement of sleeves, composite repair material and Stopaq coating
- 3Excavation of the underground 32-inch pipeline at located repair points
- 4Coating removal and NDT to determine the repair method
- 5Live repair and coating reinstatement across a 210 km length of pipeline