Exposed 32-inch export crude pipeline running along an open trench

Project · DPOC

Live Export Crude Pipeline Repair

EPC provision of pipeline repair & maintenance for the DPOC export pipeline and interfield pipeline — live repair of 210 km of 32-inch, 3LPP-coated crude line.

Scope of Works

What SWAED delivered

  1. 1Engineering for each repair point
  2. 2Procurement of sleeves, composite repair material and Stopaq coating
  3. 3Excavation of the underground 32-inch pipeline at located repair points
  4. 4Coating removal and NDT to determine the repair method
  5. 5Live repair and coating reinstatement across a 210 km length of pipeline

Photo Gallery

6 photos from site

Have a project in mind?

Talk to our engineering team.